Defect Inspection
3rd Party Engineering performs a full defect investigation for concrete and steel structures subject to deterioration, problems or in the case of evaluation for additional loading.
3PE’s scope of work is defined to:
- Assess site conditions and select the most appropriate testing methods for evaluating the structure.
- Provide results of physical and chemical examination and testing of concrete cores taken from the construction in areas of concern.
- Provide results of physical and chemical examination and testing of reinforcement.
- Provide a preliminary general assessment of overall condition of the steel structure in areas of concern.
- Provide a repair methodology.
3PE has been involved in the inspection of several structures inside and outside of Lebanon ranging from residential, commercial buildings to hospitals and plants.
Villa Bekfaya |
Tripoli Olympic Stadium |
Lycee Verdun |
Selaata Chemical Facility |
Sir El Diniyih High School |
Porsche Building |
Dorrat Loubnan |
Colortex |
Baabda 4715 |
Msaitbeh Residential Building |
SIDEM |
Feghali Building |
New Mar Takla Residential Buildings |
Sawaya Building |
Balamand University |
Elegance Building |
Bchara Lkhoury |
Credit Libanais |
Abido Warehouse |
Choueifat Warehouse |
Clemenceau Medical Center |