Defect Inspection
3rd Party Engineering performs a full defect investigation for concrete and steel structures subject to deterioration, problems or in the case of evaluation for additional loading.
3PE’s scope of work is defined to:
- Assess site conditions and select the most appropriate testing methods for evaluating the structure.
- Provide results of physical and chemical examination and testing of concrete cores taken from the construction in areas of concern.
- Provide results of physical and chemical examination and testing of reinforcement.
- Provide a preliminary general assessment of overall condition of the steel structure in areas of concern.
- Provide a repair methodology.
3PE has been involved in the inspection of several structures inside and outside of Lebanon ranging from residential, commercial buildings to hospitals and plants.
| Villa Bekfaya |
| Tripoli Olympic Stadium |
| Lycee Verdun |
| Selaata Chemical Facility |
| Sir El Diniyih High School |
| Porsche Building |
| Dorrat Loubnan |
| Colortex |
| Baabda 4715 |
| Msaitbeh Residential Building |
| SIDEM |
| Feghali Building |
| New Mar Takla Residential Buildings |
| Sawaya Building |
| Balamand University |
| Elegance Building |
| Bchara Lkhoury |
| Credit Libanais |
| Abido Warehouse |
| Choueifat Warehouse |
| Clemenceau Medical Center |






